Factory Tour
How a firefighting robot is specified, assembled, tested and supported before it reaches your site.
Built Around Modularity
From mechanical design to whole-machine testing, production is organised around a modular architecture so that standard units ship in 30 days and customised units in 60.
Manufacturing and integration take place at the company's Beijing-Tianjin-Hebei base, with R&D, testing and assembly on the same site — so a design change can be validated on the test floor the same week.
- Standard models delivered in 30 days, customised units in 60.
- 100% inspection at key process steps.
- 72-hour continuous duty validation before dispatch.
Production, Testing and Support
Six functions that stand between a specification and a machine that works on site.
Production Workshop
Modular assembly of chassis, monitor, control and communication subsystems on a single line, with torque and routing checks at every station.
Assembly & Integration
Mechanical, electrical and software integration in one flow, followed by parameter setting and function testing of every subsystem.
Quality Inspection
100% inspection at key process steps, plus whole-machine factory testing before dispatch.
Environmental Test Platform
In-house high-temperature, high-humidity, extreme-cold and high-altitude test capability, with a combustion test platform for live validation.
R&D Facilities
Mechanical, electronic control, algorithm and software teams working alongside the test floor, so design changes can be validated the same week.
After-Sales & Spares
Forward-positioned spare parts and a 24/7 hotline, with on-site support for major deployments.
From Requirement to Dispatch
Requirement Review
Scenario, hazard profile and response doctrine are reviewed with the client before any configuration is proposed.
Design & Configuration
Chassis, monitor, sensor payload and communication are configured against the site survey and the required response time.
Modular Assembly
Subsystems are assembled and integrated, with torque, routing and sealing checks recorded at each station.
Function & Water Test
Monitor flow and range, drive performance and communication links are tested against the specification.
Environmental Validation
High-temperature, high-humidity, extreme-cold and high-altitude testing, plus combustion-platform validation where applicable.
Factory Acceptance
Whole-machine inspection, documentation pack and operator training, then dispatch with forward-positioned spares.
Equipment and Operating Environment
Production configurations photographed on site. Click any image to enlarge.
Support That Starts at Commissioning
Delivery includes operator training, a maintenance schedule, factory acceptance records and certification copies for the supplied configuration. Annual refresher training, on-site support and forward-positioned spare parts are available for the life of the equipment.
Book a Factory VisitWould You Like to Visit the Factory?
We can arrange a factory visit, a live demonstration, or a remote walkthrough of the production line with an engineer.